• Design of bore selector for tordis vigdis workover system 

      Jose, Maju Mr. (Masteroppgave/UIS-TN-IKM/2012;, Master thesis, 2012)
      The cost of the workover system and the time required to run the workover equipment constitute a significant component in the subsea workover/intervention cost. But, the cost can be minimized by modifying traditional ...